What I would tell you if you called me

Solar in Pakistan is sold on claims that are difficult to check. These are the questions clients actually ask, answered with the arithmetic — including the parts that cost me work, like how to read a quotation and when a battery is being sold to you rather than specified for you.

Articles

Cost & payback 4 Aug 2026 · 6 min read

What industrial solar actually pays back in Pakistan — with real generation data

Payback claims are easy to make and hard to check. Here is 77 days of monitoring data from a 1 MW plant, including the twelve days it was off.

Read the article →

Not covered here

If your question isn't answered, ask it

These articles are general by necessity. Your load profile, your tariff and your roof are not. A site assessment starts with twelve months of your bills and ends with a number you can check — and if solar is the wrong answer for your site, that is what I will tell you.