Industrial · Vehari Industrial, Punjab

Simta Foods — 1 MW

A megawatt on a food plant that runs its load through daylight — and 77 days of monitoring data, including the twelve days the inverters were off.

Recorded generation
68,317 kWh

9 May – 21 Jul 2026, from the plant monitoring export

Best recorded day
1,884 kWh

20 July 2026

Monthly saving
PKR 1.9M

Client's own figure, against their pre-solar industrial tariff

Payback
Under 8 months

Derived from the saving above against total project cost

Measured output

What the plant actually produced

This is not a simulation. Every bar below is a day recorded by the plant's own monitoring system, transcribed from the generation report without adjustment — including the days the inverters were off.

Period
9 May 2026 — 21 Jul 2026
Source
Plant monitoring system export, consolidated in the YTECH SOLAR generation performance report
Last verified
21 Jul 2026

Recorded generation

68,317kWh

Across the full reporting period

Average per day

887kWh

Over days with recorded data

Days of data

77

Including the days output was zero

Best recorded day 1,884 kWh 20 Jul 2026
Recorded daily generation, May to July 2026 A bar for each day of the reporting period showing recorded output in kilowatt hours. Days on which the inverters were off, and days for which the monitoring system recorded nothing, are marked on the baseline rather than omitted. The full figures are listed in the table below this chart.
Recorded · 65 days
Output as logged by the monitoring system.
Inverter off · 12 days
Genuine downtime. Counted as zero, not dropped.
No data · 7 days
Plant running, nothing logged. Unknown, not zero.

On the gaps in this data

Twenty-seven days in the period carry no generation figure: eight predate commissioning, seven in late May were not recorded by the monitoring system, and twelve are genuine inverter downtime. The averages above are calculated across days with recorded data only, and the downtime is counted rather than dropped.

Monthly performance summary
Month Total yield Avg/day Best day Downtime
May 2026 20,569 kWh 1,286 kWh 1,470 kWh · 20 May 1–8 pre-commissioning; 25–31 no data recorded
June 2026 25,730 kWh 858 kWh 1,416 kWh · 29 Jun 2 days inverter off (8th, 26th)
July 2026 22,018 kWh 710 kWh 1,884 kWh · 20 Jul 10 days inverter off (22nd–31st)

How it was done

The engineering decisions

  1. What the site actually needed

    Simta Foods runs a continuous-process food plant in Vehari Industrial Estate. The thing that made it a good solar site is not the roof — it is the load curve. Machinery runs through the working day, which means the units generated between roughly 9am and 4pm are consumed on site rather than exported. Under net billing that distinction is the whole economic case: self-consumed units are worth full industrial tariff, exported ones are bought back at about a third of it. I sized the array against the daytime draw, not against the available roof area.

  2. Why these panels and these inverters

    I specified 594 JA 715W N-Type bifacial modules. Bifacial earns its premium here because the mounting height and the roof surface give the rear face something to collect — on a low-clearance install I would not have specified them and would have said so. N-Type was chosen for its lower temperature coefficient: Vehari summers sit well above the 25°C at which panels are rated, and P-Type loses more output in exactly the conditions this site generates most. Two SOLIS 125 kW inverters rather than one larger unit, so a single inverter fault costs half the plant rather than all of it.

  3. What the data says — including the bad days

    From commissioning on 9 May through 21 July the plant recorded 68,317 kWh. The best day was 1,884 kWh on 20 July. There were also twelve days when the inverters were off: two in June, and the ten days from 22 to 31 July. That downtime is in the chart on this page rather than edited out of it, because a performance report that only shows the peaks is a brochure. The monthly averages tell the same story honestly — July averaged 710 kWh/day precisely because those ten days are counted.

  4. What it cost, and what I was paid

    Every panel, inverter, cable and clamp was bought at wholesale and invoiced to Simta Foods in the supplier's own name. They hold the original invoices. I took no margin on any of it. My fee was 4% of the total project cost, invoiced after the system was commissioned and generating — which on this project meant after 9 May 2026. Had it not run, I would not have been paid.

Specification

Why this equipment, on this site

Every line in the bill of materials was a decision with a reason. These are the ones worth explaining.

Modules

594 × JA JAM72D40 715W

N-Type bifacial. Lower temperature coefficient for Vehari summer conditions.

Inverters

2 × SOLIS S5-GC125K

Split across two units so a single fault costs half the plant, not all of it.

Structure

Aluminium rail

Corrosion behaviour over a 25-year module life, on a food-processing site.

Configuration

On-grid, no storage

Daytime load matches the generation window; storage would not have earned its cost.

What I was paid

The same terms as every project on this site

Equipment bought at wholesale and invoiced to the client in the supplier's own name. No margin taken on any of it. My fee is 4% of total project cost, invoiced once the system is commissioned and generating.

The client holds every original invoice. They can check what a panel or an inverter costs in the Lahore market, and I expect them to — the model only works if the paperwork survives that.

Project record

Commissioned
System type
On-grid
Structure
Aluminium rail structure
Page updated
4 Aug 2026

Published with the client's written consent. Figures attributed to the client are marked as theirs.

The reasoning

Why this system was designed the way it was

The decisions on this project follow rules that apply to most sites in Pakistan. I have written them up in full — the sizing arithmetic under net billing, what payback really looks like against measured data, and how to check a quotation before you sign it.

More delivered work

  • Hassan Flour Mill · DG Khan

    500 kW

    PANELS
    862 × JA 580W N-Type TOPCon
    INVERTERS
    4 × SOLIS S5-GC125K 125 kW
    COMMISSIONED
    DEC 2024

    MY FEE
    4%, on commissioning

    Half a megawatt on a flour mill whose grinding load runs straight through the generating window — close to the ideal industrial solar profile.

    Read the case study : Hassan Flour Mill, DG Khan — 500 kW

  • Rehman Corporation · Rangpur

    156 kW

    PANELS
    269 × JA 580W N-Type TOPCon
    INVERTERS
    1 × SOLIS S5-GC125K 125 kW
    COMMISSIONED

    MY FEE
    4%, on commissioning